A temprary recycled-concrete road has been constructed on the Evanston Hill road alignment which connects to 144th Avenue. This is now open for local traffic as a (much welcomed) secondary access road in and out of Evanston. This was constructed as part of the Evanston Phase 19 Engineering submission.